ES Sunlogy Berhad
0345 · ACE Market创业板(ACE Market) · annual reports 2025 to 2025, 156 entries read2025 至 2025 年报,共读出 156 条
The company这家公司
ES Sunlogy was admitted to the ACE Market of Bursa Malaysia Securities Berhad on 20 February 2025. It operates in mechanical and electrical (M&E) engineering works and renewable energy, predominantly in Malaysia. The group sells electricity generated through its solar plant to Tenaga Nasional Berhad under a 25-year renewable energy power purchase agreement.ES Sunlogy 于 2025 年 2 月 20 日在马来西亚证券交易所创业板上市。集团主要在马来西亚经营机电工程业务与可再生能源业务。集团通过旗下太阳能发电厂发电,并根据 25 年期可再生能源购电协议向国家能源(Tenaga Nasional Berhad)售电。
Source: annual report 2025, pages 2, 126, 166.出处:2025 年年报第 2、126、166 页。
In 2025, M&E engineering works brought RM316.7 million (98% of total revenue), of which progress claims were RM265,072,830 and supply and install was RM51,595,931, while renewable energy contributed RM8.0 million. Four customers contributed approximately RM132.02 million or 41% of total revenue.2025 年,机电工程业务带来 RM316.7 million(占总营业额 98%),其中工程进度款为 RM265,072,830,供应与安装为 RM51,595,931;可再生能源贡献 RM8.0 million。四大客户合计贡献约 RM132.02 million,占总营业额 41%。
Source: annual report 2025, pages 24, 129, 166.出处:2025 年年报第 24、129、166 页。
ES Energy Solution Pte. Ltd. was incorporated on 9 April 2025 in Singapore to serve as a platform for regional expansion, but remained dormant during the year. On 4 September 2025, the group incorporated Sunlogy Asia Energy Storage Sdn. Bhd., subscribing for a 70% equity interest.ES Energy Solution Pte. Ltd. 于 2025 年 4 月 9 日在新加坡注册成立,作为未来区域扩张的平台,但该年度仍处于休眠状态。2025 年 9 月 4 日,集团成立了 Sunlogy Asia Energy Storage Sdn. Bhd.,认购 70% 股权。
Source: annual report 2025, pages 17, 29, 174.出处:2025 年年报第 17、29、174 页。
The largest shareholders are Datuk Keh Chuan Seng with 161,000,000 shares (23.000%), Khor Chuan Meng with 147,000,000 shares (21.000%), and Chu Kerd Yee with 147,000,000 shares (21.000%). In the list of the largest holders, Keh Chuan Seng holds 126,000,000 shares (18.00%) in his own name and 35,000,000 shares (5.00%) in a pledged securities account with Maybank Nominees (Tempatan) Sdn. Bhd.最大股东为 Datuk Keh Chuan Seng(持有 161,000,000 股,占 23.000%)、Khor Chuan Meng(持有 147,000,000 股,占 21.000%)与 Chu Kerd Yee(持有 147,000,000 股,占 21.000%)。在最大股东名单中,Keh Chuan Seng 以本人名义持有 126,000,000 股(18.00%),另有 35,000,000 股(5.00%)存于 Maybank Nominees (Tempatan) Sdn. Bhd. 的抵押证券账户。
Source: annual report 2025, pages 176, 177.出处:2025 年年报第 176、177 页。
Datuk Keh Chuan Seng resigned as a director on 18 January 2025. Chu Kerd Yee and his spouse Ong Bee Keo are directors and shareholders of U-Teknik Trading, from which the group purchased goods of RM1,632,493. Chu Ai Sehh, sister of Chu Kerd Yee, is a director and shareholder of Cena Power, from which purchases were RM4,268,521.Datuk Keh Chuan Seng 于 2025 年 1 月 18 日辞任董事。Chu Kerd Yee 及其配偶 Ong Bee Keo 是 U-Teknik Trading 的董事兼股东,集团向该公司采购了 RM1,632,493 的货品。Chu Kerd Yee 的胞妹 Chu Ai Sehh 是 Cena Power 的董事兼股东,集团向该公司采购了 RM4,268,521。
Source: annual report 2025, pages 97, 99.出处:2025 年年报第 97、99 页。
Revenue by activity, 20252025 年按业务活动划分的营业额
Source: annual report 2025, page 129.出处:2025 年年报第 129 页。
Major events大事记
Source: annual report 2025, page 141.出处:2025 年年报第 141 页。
Source: annual report 2025, page 101.出处:2025 年年报第 101 页。
Source: annual report 2025, page 99.出处:2025 年年报第 99 页。
Source: annual report 2025, pages 2, 96.出处:2025 年年报第 2、96 页。
Source: annual report 2025, page 29.出处:2025 年年报第 29 页。
Source: annual report 2025, page 174.出处:2025 年年报第 174 页。
Source: annual report 2025, page 174.出处:2025 年年报第 174 页。
Revenue and profit营业额与盈利
Assets, liabilities and equity资产、负债与权益
20252025 年
In 2025, the company raised gross proceeds of approximately RM42.0 million from its public issue of 140,000,000 new ordinary shares at RM0.30 per share. Operating cash flow was negative at RM16.2 million, which the group states was primarily due to the one-off utilisation of IPO proceeds to settle supplier balances. The group invested RM11.6 million in joint venture Selarong Pertama Energy Sdn. Bhd., repaid term loans of RM5,011,927, and paid interest of RM3,979,836. No dividend was declared or paid.2025 年,公司通过公开发行 140,000,000 股新普通股(每股 RM0.30),筹集约 RM42.0 million 的总收益。营运现金流为负 RM16.2 million,集团说明主要由于一次性动用首次公开募股收益结算供应商欠款。集团向合资企业 Selarong Pertama Energy Sdn. Bhd. 投资 RM11.6 million,偿还定期贷款 RM5,011,927,并支付利息 RM3,979,836。公司未宣布或派发任何股息。
Source: annual report 2025, pages 23, 26, 96, 99, 118.出处:2025 年年报第 23、26、96、99、118 页。
At year end年末
Total borrowings stood at RM79,417,752. Freehold land and buildings carried at RM6,506,188 and fixed deposits of RM1,250,000 are pledged to licensed banks. The group order book stood at RM180.4 million as at 31 July 2025.总借款为 RM79,417,752。账面值为 RM6,506,188 的永久地契土地及建筑物以及 RM1,250,000 的定期存款已抵押给持牌银行。截至 2025 年 7 月 31 日,集团未完成订单为 RM180.4 million。
Source: annual report 2025, pages 16, 134, 144, 147.出处:2025 年年报第 16、134、144、147 页。
Still to be spent尚未支出的承诺
Capital commitments not provided for in the financial statements included RM3,052,263 for the purchase of a piece of land, RM4,921,250 for investment in the Baram Project, Sarawak, and RM462,528 for an ERP system. Unutilised proceeds from the initial public offering stood at RM3.5 million, with RM2.5 million remaining for the development and construction of the Selarong LSSPV plant.财务报表中未拨备的资本承诺包括购买一块土地的 RM3,052,263、砂拉越 Baram 项目投资的 RM4,921,250 以及 ERP 系统的 RM462,528。首次公开募股尚未动用的收益为 RM3.5 million,其中 RM2.5 million 留待用于 Selarong 大型太阳能光伏电站的开发与建设。
Source: annual report 2025, pages 96, 167.出处:2025 年年报第 96、167 页。
Four years of figures四年数字
Group figures, in RM, as printed in the statements.集团数字,单位令吉,照财务报表所印。
| Group集团 | 2024 | 2025 |
|---|---|---|
| RM令吉 | RM令吉 | |
| Revenue营业额 | – | 324,676,984 |
| Profit before tax税前盈利 | – | 21,142,316 |
| Profit for the year年度盈利 | – | 15,395,519 |
| Net cash used in operating activities营运活动所用现金净额 | – | (16,139,082) |
| Net cash used in investing activities投资活动所用现金净额 | – | (41,854,402) |
| Net cash from financing activities融资活动所得现金净额 | – | 62,416,723 |
| Total assets总资产 | – | 279,455,509 |
| Total liabilities总负债 | – | 166,686,882 |
| Total equity总权益 | – | 112,768,627 |
| Cash and bank balances现金与银行结余 | – | 18,265,111 |
| Fixed deposits with licensed banks持牌银行定期存款 | – | 7,245,533 |
On a computer, hover over a figure for the report and page it is printed on.在电脑上把鼠标移到数字上,可看到它印在哪份年报的哪一页。
Said and done说过的与做到的
Only one annual report has been read so far, so there is no later report to check its plans against.目前只读了一份年报,还没有之后的年报可以对照它的计划。
What the reports leave open年报留下待看的事
- Completion of the Selarong LSSPV plant, which the report says is 85% to 90% completed with completion targeted by the end of 2025, and the results of joint venture Selarong Pertama Energy Sdn. Bhd., which incurred a loss of RM732,124 as at 31 July 2025.Selarong 大型太阳能光伏电站的完工;年报称其工程已完成 85% 至 90%,目标在 2025 年底前完工。以及合资企业 Selarong Pertama Energy Sdn. Bhd. 的业绩,该公司截至 2025 年 7 月 31 日录得亏损 RM732,124。
Source: annual report 2025, pages 25, 108.出处:2025 年年报第 25、108 页。
- Execution of the group order book of RM180.4 million as at 31 July 2025 and billing of net contract assets of RM65,286,128.截至 2025 年 7 月 31 日总额为 RM180.4 million 的未完成订单的执行情况,以及 RM65,286,128 净合同资产的开票结算进展。
Source: annual report 2025, pages 16, 106.出处:2025 年年报第 16、106 页。
- Arbitration proceedings with Itramas, where Itramas seeks liquidated ascertained damages of RM1,846,182.03 and RM41,070.00 for alleged defects while Savelite counterclaims RM2,154,038.18, with hearings fixed in December 2025.与 Itramas 的仲裁程序进展;Itramas 索赔 RM1,846,182.03 的违约赔偿金及 RM41,070.00 的缺陷修复费,而 Savelite 反诉 RM2,154,038.18,聆讯定于 2025 年 12 月进行。
Source: annual report 2025, page 173.出处:2025 年年报第 173 页。
- Development under the Heads of Agreement with Planet QEOS Sdn. Bhd. for the 155 MWp solar plant with 310 MWhr battery storage in Long Lama, Baram, Sarawak. Capital commitments include RM4,921,250 for investment in the Baram Project, Sarawak.与 Planet QEOS Sdn. Bhd. 签署主要协议条款的砂拉越 Baram 的 Long Lama 155 MWp 太阳能发电厂及 310 MWhr 储能项目的进展。资本承诺包括砂拉越 Baram 项目投资 RM4,921,250。
Source: annual report 2025, pages 167, 174.出处:2025 年年报第 167、174 页。
Facts as printed in the company's annual reports, with the page of each; no rating and no advice. Built 2026-10-24.内容为公司年报所印的事实,并注明页码;不评级,不构成投资建议。生成日期 2026-10-24。